News
- [09-20-2011]CNOOC Ltd. Announces Strong Production Growth and Outstanding Exploration Results of 2009
- [09-20-2011]Drill Stem Test
- [09-20-2011]UPDATE 1-Petrobras restarts Tupi oil field test production
- [10-12-2010]Casing (borehole)
- [09-03-2010]How to Clean a Pipe Line
- [09-03-2010]Drill pipe
- [08-14-2010]What is the drill pipe
- [07-28-2010]Jiang Jiemin meets Shell CEO Peter Voser
- [07-26-2010]CNOOC Ltd. Announces Commencement of Oil Production from BZ 29-4
- [07-22-2010]Friction welding drill pipe manufacturing
- [07-20-2010]CNOOC Ranks 252 on Fortune Global 500 2010
- [07-16-2010]Tarim large chemical fertilizer plant becomes operational
- [07-15-2010]The operational management of Rumaila Oilfield officially transferred to ROO
- [07-08-2010]Jiang Jiemin interviews Sudanese presidential assistant Nafie Ali Nafie
- [07-07-2010]Jiang Jiemin meets with the First Secretary of SPDC of Myanmar Thihathura Tin Aung Myint Oo
- [07-06-2010]Top drive system for 9000 m drilling rigs comes out at BOMCO
- [07-02-2010]Construction commences of the main installations of the 5Mt/a refining project at Ningxia Petrochemical
- [07-02-2010]CNPC and CRC sign strategic cooperation agreement
- [06-28-2010]CNPC and China Unicom sign strategic cooperation agreement
- [06-22-2010]Jiang Jiemin meets with CPC President Zhu Shaohua
- [06-21-2010]CNOOC Ltd. Completes Acquisition of Stake in Block 15/34
- [06-17-2010]China and Kazakhstan sign agreement on the construction of the phase-Ⅱgas pipeline
- [06-17-2010]"COSL Rival" Rig Granted AOC Certificate for Operation in Norwegian Waters
- [06-13-2010]Natural gas purchase and sale framework agreement signed between China and Uzbekistan
- [06-12-2010]3000m truck-mounted rig successfully manufactured at BOMCO
- [06-12-2010]CNOOC Ltd.'s BZ25-1/ BZ25-1South Oilfields Back to Full Production
- [06-10-2010]Welding of the Mohe-Daqing section of the Russia-China Crude Pipeline completed
- [06-09-2010]Mr. Jiang Jiemin interviews Schlumberger Chairman & CEO Andrew Gould
- [06-08-2010]Deepwater pipe-laying vessel "Hai Yang Shi You 201" Docks for Debugging
- [06-07-2010]Myanmar-China Oil and Gas Pipeline project commenced
Please send your message to us
(All fields are required.)
| Your E-mail | |
|---|---|
| To | |
| Title | |
| Content |
English









